We replaced four DX package units with chilled water AHUs, installed a new mechanical services switchboard, and modified ductwork to accommodate the new AHUs. The project was completed in a live prison facility, with strict security protocols in place. All materials were carefully coordinated in and out through secure pathways.
Essential Air Solutions undertook the HVAC upgrade at the Lotus Glen Correctional Centre, a high-security facility, focusing on replacing and modernising critical air handling systems. This involved replacing four DX package units with advanced chilled water air handling units (AHUs) by AirDesign, installing a new mechanical services switchboard, and modifying existing ductwork to accommodate the upgraded AHUs.
Operating within a live correctional facility presented unique challenges, including stringent security protocols, limited site access, and the need for meticulous inventory management.
To address these challenges, our team implemented the following strategies:
The HVAC upgrade at the Lotus Glen Correctional Centre was completed successfully, enhancing the facility’s climate control capabilities while adhering to the highest security standards. The new chilled water AHUs delivered improved energy efficiency, reliability, and performance, aligning with the centre’s operational requirements.
This project showcased Essential Air Solutions’ ability to deliver complex HVAC solutions in highly regulated and secure environments, highlighting our commitment to precision, planning, and excellence.
Essential Air Solutions Pty Ltd
is proud to be part of the
Kolsen Group.
Where to find us
Quick links
Copyright © 2025 | Developed by Adllins Media
ABN 99_607_444_315|ACN 607_444_315|RTA AU38512|QBCC 15005460|Electrical Contractors Licence No. 82642